Previous Projects

Opus One Maintenance Facility - Oakville

The project involved the construction of a building pad, driveway, and parking area. Additionally, underground infrastructure was installed, including power lines, domestic water lines, a septic system, fire lines, hydrants, and a storm drainage system.

Opus One Maint Facil.jpg

Gamble Family Winery

​This project involved the construction of a driveway and parking area, along with the installation of underground infrastructure. The underground infrastructure included power lines (PG&E primary power), domestic water lines, fiber optic trenching, and a storm drainage system.

Gamble-Family-Vineyards-3.jpg

Hourglass Winery – Calistoga

This project involved the development of a driveway, demolition of existing concrete slabs, and a post-fire inspection of the septic tank.

hourglass.jpg

Odette Winery – Napa

The project involved the demolition of existing structures, slabs, and foundations. Following demolition, a building pad was constructed, along with a driveway and parking area. Underground infrastructure was also installed, including power lines (PG&E primary power), domestic water lines, a septic system, processed waste systems, fire lines, hydrants, and a storm drainage system. Additionally, cuts were made for shotcrete walls at the wine cave entrances.

odette.jpg

PlumpJack Estate/CADE Winery - Napa

​This project involved the removal of trees and brush to clear the site. Following site preparation, a driveway and parking area were constructed, along with a building pad. Underground infrastructure, including power lines (PG&E primary power), domestic water lines, a septic system, processed waste systems, fire lines, hydrants, and a storm drainage system, was also installed. Additionally, cuts were made for shotcrete walls at the wine cave entrances.

cade.jpg

Ovid Winery – Napa

This project involved the construction of a building pad, driveway, and parking area. Underground infrastructure was also installed, including power lines (PG&E primary power), domestic water lines, a septic system, processed waste systems, fire lines, hydrants, and a storm drainage system. Additionally, cuts were made for shotcrete walls at the wine cave entrances. The project also included site work and utility installation to serve residences in the area.

Ovid.jpg

Contact Us

Call or Message Quality Incorporated Site Work & Underground
with questions or for a Free Quote!

Thanks for submitting!

    1718 Jefferson St.

    Napa, CA 94559

    admin@qualityisu.com

    (707) 257-7386

    © 2025 Quality Incorporated Sitework & Underground​

    bottom of page